Advisors Prof. Pratim Biswas, Member, US National Academy of Engineering; former Dean of Engineering, University of Miami Prof. Janat Shah, founding Director, IIM Udaipur

Thermo-Cognitive Advanced Process Control (TC-APC) models, simulates and optimizes your process in real time to improve yield, conversion and throughput, and reduce energy use, with a quick payback.

Sugar, ethanol and fermentation

The pan and the fermenter both run on numbers nobody measures.

Pan boiling runs on the pan man's eye and a clock.

Fermentation runs on a recipe written for last season's molasses.


Problems we hear

In the words plants use when they search.

  • Pan boiling automation
  • Vacuum pan control
  • Massecuite boiling time
  • Fermentation efficiency low
  • Fermentation efficiency improvement
  • Alcohol yield per tonne molasses
  • Fermentation yield low
  • Fermenter dissolved oxygen control
  • Foam control fermenter
  • Wort boiling energy
  • Brewhouse energy consumption
  • Brewery fermentation temperature control

Engineering proposal. Begins with a free check.

The science under TC-APC

A boiler's result is decided in the flame and the fuel.

In a sugar mill the fuel is bagasse, wet and variable, and the steam it raises runs the whole mill. How completely it burns is set in the flame. That's the science TC-APC is built on, and AI makes it sharper.

This is the field of our Chief Scientific Advisor, Prof. Pratim Biswas, Member, US National Academy of Engineering and former Dean of Engineering, University of Miami. His work includes:

  • Aerosol formation during biomass pyrolysis, studied in a flat flame reactor. Fuel, 2014
  • Paint to Power, with Chrysler and Ameren: paint solids from Chrysler's St. Louis plants replaced about 570 tons of coal a year at Ameren's 855 MW Meramec power plant. He led the project to capture mercury with the titanium dioxide in those solids. 2007 Chrysler Environmental Leadership Award. Washington University, 2008

Boilers and combustion · His full record


What nobody measures.

Supersaturation in the pan

It decides the crystal, and in seventy years nobody has measured it online.

Sugar and alcohol in the fermenter

Efficiency is found out when the wash is analyzed, after the batch has made its choices.

Steam per tonne of cane

The boiling house, the distillery and the boiler share one steam bill that no single meter explains.

Each of these is worked out live from the physics of the readings your plant already has. TC-APC then holds the process at the optimum as it moves, writing setpoints back to your DCS, PLC or SLC within limits you set.

The nearest proof pages are sugar crystallization in vacuum pans and boilers and combustion.


What we commit to

The same eight commitments, on every project.

No gain, no project

If the check finds nothing worth doing, we say so and stop there.

Savings on your own meters

Before and after, on your instruments, so the result is yours to check.

Shadow mode first

It writes setpoints only after you have watched it be right.

Interlocks untouched

Trips, interlocks and the safety system stay under their own logic.

Runs inside your plant

On its own industrial system and your network, working when the internet is not.

Uses existing instruments

It reads what your DCS, PLC or SLC already measures, and says so where one instrument would close a gap.

Physics first, then AI

A model of the process's own physics, with learning only for what physics cannot know.

Published in Chemical Weekly

The approach, set out as a Special Report in October 2025.

The mark

Find the optimum. Hold it while it moves.

The curve is a yield or selectivity response. The amber point is the optimum, and the dashed drop is where it sits on the operating axis.

The second half of the line is the part that matters. Finding an optimum is a study, and studies end up in drawers. Holding one while the feed, the fouling, the weather and the wear keep moving it is a control problem, and that is the work.

Start with your log sheets

Send one month of log sheets from one area

Photographs are fine. We will show you what the area is losing, which meters disagree with the physics, and what that is worth, including the answer that there is nothing worth pursuing. No charge, and no commitment either way.

Or start with three months of data

If you already keep a historian

Send three months of operating data from one unit, with the laboratory results beside it. The same exercise, done faster, with the same honest answer at the end. How both work.

projects@yielddynamics.in Talk to IIT Bombay engineers Call +91 94230 07004Monday to Saturday, 9:00 to 19:00 IST

WhatsApp